Saturday, November 5, 2016

A New Light

It was long past time to put a light out in the shed yard
so the chores don't have to be done in complete darkness.
Thursday was the chosen day.

After choosing the right pole from the pile
Ben moved the pole to the corn crib
and then Paul and Ben dug the hole.

 The pole was plopped in the hole.

They got it plumbed,

built the non-OSHA approved scaffolding,

and climbed up to get ready to cut off the top.

The top was cut off to make it the right height.
Luke had the rope that was connected to the top.

Tools had to be brought up.

The light was connected
and half of the wiring was done.

But we were short one somethingerother
so it will have to be finished today.